EP Draft
AI-assisted Phase I ESA reporting

ASTM E1527-21 · Source-traceable drafts

Phase I ESA reports drafted in hours, not days.

Built for the senior EP who reviews, edits, and signs the report.

01 · Ingest
EDR + site files
02 · Draft
Cited sections
03 · Review
EP stays in control
Topographic site map with field evidence and source materials
Evidence workspace
Sources linked to the draft
Draft statusReady for EP review